SpaceX · xAI · Tesla
How much power is Elon bringing online?
A live tally of the power supply behind Elon Musk's AI data centers, built from permits, utility filings and reporting. Pick a point in time, then click any part of the chart to see where that power comes from.
-
Power supply at the source (turbines and grid hookups) for SpaceX AI sites. Solid = on record as running. Light hatched = approved, permitted or announced, not yet shown running. Batteries are backup, not supply. Tesla's 225-265 MW is compute load on the grid and is shown under Key numbers. Updated -
How to read the labels
permit/filing verified backed by a permit or filing
reported credible reporting or an agreed order
Elon claim said by Elon, not yet backed up
estimate our own math
analyst forecast a third party's projection
Key numbers
The figures behind the chart
Does the power exist?
Next 60 days Nov 1, 2026 to Jan 1, 2027
Compute vs power, 2025-2027 MW
Sites
All figures with source type and status
2027-2030 outlook estimate
Dashed line = base case. Shaded band = low to high. Low uses only permitted or energized power. High takes announced plans at face value.